搜索一级毛片A淫免费视频_国产精品女人呻吟白浆在线观看_精品日韩AV无码专区免费_让你变得红润少妇毛片_中文字幕巨爆区乳爆系列_欧美性爱99久久式_一本加勒比hezyo东京热无码_不卡免费国产高清视频_亚洲天堂色婷婷_国产精品喷潮在线观看

WELECOME TO THE WUXISENCAN WELDING MACHINERY CO.,LTD WEBSITE

Select Language Version:簡體中文|English

燦森焊接

NATIONAL SALES HOTLINE
13585011595
0510-85503992
森燦焊接
Contact Us
NATIONAL SALES HOTLINE:13585011595
0510-85503992

Tel:0510-85503992

Fax:0510-85503992

Sales hotline:13585011595

Contacts:Zhou jian xing

E-mail: 13585011595@163.com
sales@sencanjixie.com

Add:Qinxin industrial Fields,Binhu Dist,Wuxi City,Jiang su

Current Location:Home > News
The installation and commissioning of the equipment is the premise to ensure the good performance and reliability of the equipment. The roller frame equipment is required to have a concrete foundation, and the concrete layer is not less than 200mm.
1) before the installation of the equipment, the foundation of the equipment must be done well to ensure the normal maintenance period of the concrete and the installation position of the equipment on the same horizontal line.
2) during the installation of the equipment, the installation and fixation of the equipment shall be carried out according to the installation requirements of the general equipment. The expansion bolt can be used for fixation (or the pressing plate is used for fixation). During the installation, the two groups of rollers must be placed in parallel, the center of which shall be the same, and the integrity of each part of the equipment shall be ensured.
3) after the installation of the equipment, check whether all parts of the equipment meet the assembly requirements, ensure the normal electrical wiring of all parts, check and clean the periphery of the equipment, and ensure that there are no obstacles affecting the normal operation of the equipment.
4) initial operation: there shall be no abnormal noise and vibration when starting the operation. If there is any problem, it is necessary to remove the fault, lift the workpiece on the roller frame for a test run, and observe whether the workpiece is close to the roller, and whether there is large axial movement, or adjust the position of the roller frame.
5) operation and use of equipment: power on operation can only be carried out after normal installation of equipment.
1. When the equipment is started and operated, there shall be no abnormal noise and vibration. If there is any, the fault must be eliminated first. When the workpiece is hoisted on the roller frame, first observe whether the workpiece position is appropriate? Is the workpiece close to the roller? Is there any foreign matter on the workpiece that hinders the rotation? When everything is normal, it can be put into operation.
2. Before starting the motor, carefully check the wiring once. After confirming that the wiring is correct, close the power switch, start the motor, check that the rotation direction is consistent with the required direction, turn on the speed regulating switch, and adjust the speed regulating knob from small to large to the required speed. The remote control box led out from the control box is used for remote operation of roller frame to realize forward rotation, reverse rotation, stop, etc. of roller. Note: when changing the rotation direction of the workpiece, it is necessary to press the reverse button after the motor stops completely, otherwise, it is easy to burn the motor or other components. After work, turn the speed control knob to the minimum, turn off the speed control switch and turn off the power switch.